Charging infrastructure for your fleet and staff

AC and DC charging stations for electric vehicles: fleets, staff, customers or public. Cloud supervision, integrated billing and energy control.

Our expertise

Electrify your mobility without overloading your grid

An electric fleet requires reliable — but also smart — charging infrastructure. Without it, peak power draws trigger massive extra costs on your energy bill.

Nuance designs your full charging infrastructure: AC stations (7 to 22 kW) for staff, DC stations (50 to 350 kW) for fleets and public use, load management to avoid peaks, and EMS integration to charge on solar and off-peak hours. We also support you on the operating model (billing, tokens, staff reimbursement).

Your benefits

What this project actually changes for you

01

Built-in load management

Smart power sharing — no over-sizing of the network.

02

Solar-driven charging

The EMS charges your vehicles from PV whenever possible.

03

Billing & reporting

Per-user tracking, staff reimbursement, accounting exports.

Techniques & materials

AC, DC, public or private

We cover every fleet and infrastructure use case.

01
AC 7-22 kW stations Staff, offices, light fleets.
02
DC 50-150 kW stations Commercial fleets, logistics depots.
03
Ultra-fast 175-350 kW Public charging hubs.
04
Load management Smart sharing of available power.
05
Cloud supervision Monitoring, alerts, usage stats.
06
Billing & tokens Staff reimbursement, badges, ISO 15118.
Our method

How an EV project runs

1

Needs study

Number of vehicles, use, grid power.

2

Sizing

Stations, cabling, main switchboard, load mgmt.

3

Installation

Civil, electrical, commissioning.

4

Operation

Supervision, billing, maintenance.

Ready to start?

Time to electrify your fleet?

Full study of your charging infrastructure — sizing, business model and EMS integration.

Back to home